adding custom number resource
RH

Forum home » Delegate support and help forum » Microsoft Project Training and help » Adding custom number to resource usage with predefined text

Adding custom number to resource usage with predefined text

resolvedResolved · Medium Priority · Version 2007

Adding custom number to resource usage with predefined text

In the resource uage, the list of project names comes under the resource name to show the projects each resource is working on. Each of my projects has a reference number so I added a number column but its there a way conditionally format as you would in excel to create a rule which means that if there is a specific project name, the reference number is automatically populated so i dont have to manually input it for each?
Thanks, Emma

RE: Adding custom number to resource usage with predefined text

Hi Emma,

Thank you for your question and welcome to the forum.

You could possibly create your own WBS code and add the column after. Then I am assuming each project name will be level one and the tasks level 2. Then you can create your own WBS code for each level.

I hope this answers your question.

Regards

Simon

Wed 27 Feb 2013: Automatically marked as resolved.


 

MS Project tip:

Create own ribbon tab - Project 2010

a. In Project click on the File tab
b. Select Options from left hand side
c. Choose the Customize Ribbon section
d. Click the New Tab button (below the list of tabs on the right hand side of the dialog box)
e. Select the New Tab (Custom) and enter a name, by clicking the Rename button (below the list of tabs on the right hand side of the dialog box)
f. Select the New Group (Custom) and enter a name, by clicking the Rename button (below the list of tabs on the right hand side of the dialog box)
g. Add commands to your tab and group by locating them on the list on the right hand side (remembering that you can change the list using the drop down box at the top of the list of commands) and clicking the Add button between the two panes to add them to your tab and group
h. You can rearrange the commands in your group, the groups on any tab or the tabs, using the up and down arrow buttons beside the list of tabs.
i. Click OK to apply your changes

View all MS Project hints and tips


Server loaded in 0.06 secs.