text

Forum home » Delegate support and help forum » Microsoft Project Training and help » Text

Text

resolvedResolved · Low Priority · Version 2007

Caroline has attended:
Excel Intermediate course

Text

How do I attach a text review box to one of my tasks.

RE: text

Hi Caroline

thank you for your question. You can connect a drawing object to a task by double clicking on it and from the Size and Position tab. Set the drawing to Attach to task and type in the row number (ID) of the task in question. When you choose OK you may find the drawing moves. Drag it back to the best location for this shape. Now when the task it's linked to moves so will the drawing.

I hope this helps - do let us know if you have any further questions.


Kind regards,
Andrew

Tue 24 Mar 2009: Automatically marked as resolved.


 

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.

View all MS Project hints and tips


Server loaded in 0.07 secs.