How to alter a project start date?

RE: Project 2007

Hi Karen

Thanks for your question. You can move the start date for your project by going to the Project > Project Information menu.

Once you have a schedule planned (but before you record progress) you can adjust your project, preserving any float, by switching on the Analysis toolbar (View > Toolbars > Analysis), clicking on Adjust dates and then entering a new date for your project.

I hope this helps - do let us know if you have any further questions.

Kind regards,

Andrew
Kind regards,
Andrew

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.

View all MS Project hints and tips

Connect with us:

0207 987 3777

Call for assistance

Request Callback

We will call you back

Server loaded in 0.1 secs.