Projects (resource work times)

My project is to feature varying types of labour including sub contract, manufacturing and office based work: How can I alter and manage the numerous different calendars?

RE: Projects (resource work times)

we cover this on our Advanced course, if you bring the project to the course the trainer will be able to go through this with you

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.