Public Schedule Face-to-Face & Online Instructor-Led Training - View dates & book

microsoft project

Forum home » Delegate support and help forum » Microsoft Project Training and help » Microsoft project 2010

Microsoft project 2010

ResolvedVersion 2010

Neil has attended:
Project Intro Intermediate course

Microsoft project 2010

how to i attach an email to my project

RE: microsoft project 2010

Hi Neil

Thank you for your question. The email would have to be saved out of Outlook as a file - you can do this by opening the message and choosing File > Save as and saving as outlook message format or perhaps html (if you can create pdfs then this would also be an option)

In Project you can double click a task and on the notes tab choose the Insert Object button, choose the Create from file option and browse to find your document. Tick the box to display as and icon then choose OK.

Now the attached document can be read by double clicking the icon in notes.

I hope this helps - do let us know if you need any further information.

Kind regards,
Andrew

Fri 23 Dec 2011: Automatically marked as resolved.

MS Project tip:

Create own ribbon tab - Project 2010

a. In Project click on the File tab
b. Select Options from left hand side
c. Choose the Customize Ribbon section
d. Click the New Tab button (below the list of tabs on the right hand side of the dialog box)
e. Select the New Tab (Custom) and enter a name, by clicking the Rename button (below the list of tabs on the right hand side of the dialog box)
f. Select the New Group (Custom) and enter a name, by clicking the Rename button (below the list of tabs on the right hand side of the dialog box)
g. Add commands to your tab and group by locating them on the list on the right hand side (remembering that you can change the list using the drop down box at the top of the list of commands) and clicking the Add button between the two panes to add them to your tab and group
h. You can rearrange the commands in your group, the groups on any tab or the tabs, using the up and down arrow buttons beside the list of tabs.
i. Click OK to apply your changes

View all MS Project hints and tips

Connect with us:

0207 987 3777

Call for assistance

Request Callback

We will call you back

Server loaded in 0.1 secs.