Forum home » Delegate support and help forum » Microsoft Project Training and help » Work level available

Work level available

ResolvedVersion 2007

Ben has attended:
Project Intro Intermediate course

Work level available

when looking to level work is there a way of viewing the max level of 'work' available for allocation so that you can see the variance for levelling?

RE: Work level available

Hi Ben,

Thank you for your question.

If you change the view to Resource Usage and right click over the hours window, choose the Remaining Availabilty and it should add it as a row.

I hope this answers your question.

Regards

Simon

Tue 12 May 2009: Automatically marked as resolved.

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.

View all MS Project hints and tips

Connect with us:

0207 987 3777

Call for assistance

Request Callback

We will call you back

Server loaded in 0.12 secs.