microsoft project 2003 training - How do I link tasks

ResolvedVersion Standard

Chris has attended:
Project Intermediate course

How do I link tasks

as above

RE: how do I link tasks

Hi Chris

Thank you for the question

In the Task Name field, select the tasks you want to link.
Click link Tasks button on the toolbar

Tracy

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.