Jonathan has attended:
Project Intro Intermediate course

MS Project / prince2 integration

how do you align MS Project to Prince2 methodology?

RE: MS Project / prince2 integration

Hi Jonathan

Thank you for your question. There are third party products designed to align MS Project with the Prince2 methodology. They are not developed by Microsoft so you would need to search the internet for possible suppliers.

I'm sorry I couldn't be more helpful on this occasion - do let us know if you have any further questions.

Kind regards,
Andrew

RE: MS Project / prince2 integration

Hi Jonathan

to be honest there is very literature aimed at this area. However, there was a good by Paul Eastwood Harris highlighting practical guidelines on how to use Microsoft Project in a Prince2 project environment:- Prince2 Planning & Control Using Microsoft Project, lSBN 978-1-921059-37-7. There is a good training provider, Firebrand Training, whom you can consult on how their Prince2 course pervades controlling and planning with Microsoft Project.

Sorry I couldn’t be of more help.

Dave

Thu 6 Aug 2009: Automatically marked as resolved.

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.

View all MS Project hints and tips

Connect with us:

0207 987 3777

Call for assistance

Request Callback

We will call you back

Server loaded in 0.11 secs.