Public Schedule Face-to-Face & Online Instructor-Led Training - View dates & book

project

ResolvedVersion 2003

Mike has attended:
Project Intro Intermediate course

Project

how do you best protect your project work

RE: project

Hi Mike

thanks for your question. You can set save options in Project by going to File > Save As then clicking on the Tools drop down box and choosing General Options. The Save Options dialog box appears. From here you can set a Protection password or a Write reservation password.

I hope this helps - let us know if you have any further questions.

Kind regards,
Andrew

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.

View all MS Project hints and tips

Connect with us:

0207 987 3777

Call for assistance

Request Callback

We will call you back

Server loaded in 0.09 secs.