Why don't deadlines show up in the calendar view?

RE: Deadlines

The bars are generally too short! To display deadlines:

1. Right click a task box and choose Bar Styles.
2. In the Task Type box, choose Noncritical
3. In the Fields box, type a comma after the last field
4. Click the dropdown arrow and choose Deadline
5. Repeat steps 1 to 4 but in step 2 choose Critical

Hows that?

MS Project tip:

Avoid Accidental Constraints

The initial default table is the Entry table. Enter a task name and duration, but do not enter start or finish dates. Form the plan using links, predecessors. Typing dates introduces constraints. To remove these constraints, double click on a task, and on the Advanced page of Task Information set the constraint back to As Soon As Possible (all other options are there too.)