microsoft project server/central - Reports

ResolvedVersion Standard

Anita has attended:
Project Intro Intermediate course

Reports

How do I save and send reports?

RE: Reports

Hi Anita,

Can you clarify a few points please.

How do you want to send the reports?

Does the intended recipient have project on their system and if so do they have access to the actual project files?

If you want to send information about a project to someone without access to the project files, the best option might well be to export the data into Excel and format it there.

Regards

Stephen

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.

View all MS Project hints and tips

Connect with us:

0207 987 3777

Call for assistance

Request Callback

We will call you back

Server loaded in 0.09 secs.