wbs

ResolvedVersion 2007

Carl has attended:
Project Advanced course

WBS

What is WBS

RE: WBS

A work breakdown structure (WBS) is the hierarchy of tasks in the project represented by a combination of numbers or letters.

Have a look at this link for a better explanation.

http://www.tacticalprojectmanagement.com/microsoft-project-tips/microsoft-project-tip-2-build-the-right-work-breakdown-structure.html

Thanks
Paul

Mon 24 Oct 2011: Automatically marked as resolved.

MS Project tip:

Avoid Accidental Constraints

The initial default table is the Entry table. Enter a task name and duration, but do not enter start or finish dates. Form the plan using links, predecessors. Typing dates introduces constraints. To remove these constraints, double click on a task, and on the Advanced page of Task Information set the constraint back to As Soon As Possible (all other options are there too.)

View all MS Project hints and tips

Connect with us:

0207 987 3777

Call for assistance

Request Callback

We will call you back

Server loaded in 0.1 secs.