Public Schedule Face-to-Face & Online Instructor-Led Training - View dates & book

display work

ResolvedVersion 2003

Frederique has attended:
Project Intro Intermediate course
Dreamweaver Introduction (2 days) course

Display of "work"

Is it possible to dispaly "work" in days, instead of hours ?

RE: display of "work"

Hi Frederique

Thanks for your question. You can change the way Work is entered and displayed. Go to the Tools menu > choose options and click on the Schedule tab and set Work is entered in to days.

I hope this helps - apologies for the delay!

Kind regards,
Andrew

MS Project tip:

Create own ribbon tab - Project 2010

a. In Project click on the File tab
b. Select Options from left hand side
c. Choose the Customize Ribbon section
d. Click the New Tab button (below the list of tabs on the right hand side of the dialog box)
e. Select the New Tab (Custom) and enter a name, by clicking the Rename button (below the list of tabs on the right hand side of the dialog box)
f. Select the New Group (Custom) and enter a name, by clicking the Rename button (below the list of tabs on the right hand side of the dialog box)
g. Add commands to your tab and group by locating them on the list on the right hand side (remembering that you can change the list using the drop down box at the top of the list of commands) and clicking the Add button between the two panes to add them to your tab and group
h. You can rearrange the commands in your group, the groups on any tab or the tabs, using the up and down arrow buttons beside the list of tabs.
i. Click OK to apply your changes

View all MS Project hints and tips

Connect with us:

0207 987 3777

Call for assistance

Request Callback

We will call you back

Server loaded in 0.09 secs.