After entering the tasks is there any way to share them with others without having the project server?

Thanks

RE: MS Project

Hi Olesya,

Thank you for your question.

1. You could copy and paste the tasks into excel and send them the file or use the Export wizard.

2. Filter the relevant tasks and print them out by choosing PDF Writer from the printer options. Then send the attachment.

3. You could create a report that shows the tasks for a particular resource and then PDF the file by using the method in point 2.

I hope this answers your question.

Regards

Simon

Fri 5 Jun 2009: Automatically marked as resolved.

MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.