Is there a best practice checklist to get a more accurate critical path?

Edited on Tue 6 May 2008, 11:03

RE: Critical Path

Hi Ezequiel

the Critical path is calculated based on your plan. Elements such as logic, duration and constraints will have an impact on the calculation of the path.

Microsoft produce a guide called the Project Map which you may find of interest.

I hope this is helpful - do let me know if you need any further information.

Kind regards,

Andrew



MS Project tip:

Autofit column width – Project (all versions)

At the top of the columns where each column name is located (Task Name, Duration, etc.), hover over the vertical column line which you want to move.

A short bold vertical line will appear, with horizontal arrows pointing left and right.

Left click and hold this icon and it will permit you to grab the column line, allowing you to move it left or right to your desired location.

View all MS Project hints and tips

Connect with us:

0207 987 3777

Call for assistance

Request Callback

We will call you back

Server loaded in 0.1 secs.